CASE STUDY · ENTERPRISE WORKFORCE ANALYTICS
MyDelta
Every team benchmarked.Every node one click away.
Design Lead for an enterprise workforce analytics platform used across 200K+ employees. Six modules, one system.
Global Finance
1,567 users
Engg Org
412 users
Finance
386 users
Service Delivery
529 users
Trade Finance
141 users
Treasury
97 users
40%
faster decision turnaround for managers
6
modules redesigned and moved off the legacy UI
200K+
employees covered by the platform
IN SHORT
The case in thirty seconds
THE PROBLEM
Managers pieced together productivity from fragmented tools, slow Power BI reports and manual KPI pulls. Decisions came late and were hard to defend.
WHAT I DID
Set one strategy across six modules: benchmark instead of just reporting, summary first, and keep legacy views until people trusted the new ones.
THE RESULT
Faster, better-grounded decisions for managers: 40% faster turnaround, and one consistent product instead of six separate tools.
PRODUCT REEL
MyDelta in eighty seconds
A quick tour of the problem, the six modules and what changed for managers.
MY ROLE
What I owned, beyond the screens
Seniority on this project meant setting direction across modules, aligning people with different priorities, and making sure engineering could build what we designed.
I OWNED
- UX strategy and information architecture across six modules
- Design principles every module followed
- One brief agreed across management, support, sales and marketing
- Design decisions within Power BI’s technical limits
- Specs and style guidelines for engineering handoff
- Moving users off the legacy UI without forcing them
WHO I WORKED WITH
- Management and BU headsPriorities, trade-offs and sign-off
- Product and engineeringFeasibility, data model and Power BI constraints
- Managers, analysts and scrum mastersInterviews, prototype walkthroughs and testing
- Support and salesRequirements from the field and launch plans
THE PROBLEM
Plenty of data. Very little clarity.
Productivity, time and KPI data sat in separate systems. Reports were slow, visuals were hard to read, and nothing compared a team against anything meaningful. Managers and BU heads made decisions on partial pictures.
“It’s hard to identify workload imbalance across roles. Some are overburdened while others are underutilised.”
“Power BI dashboards with large datasets load slowly, which delays my decision-making.”
“As a BU head, I lack visibility into how effective our mentoring initiatives are across teams.”
Late decisions
Slow, heavy dashboards delayed calls that needed to be made that week.
Hidden imbalance
Overloaded and under-used people went unnoticed until it became a problem.
Manual effort
Pulling KPIs and formatting reports for stakeholders ate hours every cycle.
STRATEGY
Five principles I set for every module
Six modules built over four years could easily have felt like six different products. These principles kept every decision consistent, and gave the team a shared way to settle debates.
Benchmark, don’t just report
A number means little on its own. Every view compares against the team average, the previous period or an ideal.
Summary first, detail on demand
Answer the manager’s first question on one screen, then let them drill down to any node in the hierarchy.
Migrate trust, not just screens
Keep the legacy view available until people trust the new one. Adoption follows confidence.
Set up once, run automatically
Turn repeated manual work into a one-time setup and a schedule.
Design for how data travels
Dashboards get screenshotted and emailed, so labels and context must travel with them.
WHY THIS MATTERS
Principles turned design reviews from opinion into a check: does this screen benchmark, summarise first, and keep users’ trust?
PRODUCT STRUCTURE
One product, organised around four jobs
I grouped the modules by the job a user is doing, not by the team that built them. That shaped navigation, entry points and what each role sees first.
CONNECT DATA
Integration
Used byAdmins, Managers
UNDERSTAND PERFORMANCE
Team Productivity
My KPI & My Productivity
Time Profile
Used byManagers, BU heads, individuals
ACT AND GROW
Mentoring
Vendor Management
Used byManagers, BU heads, vendor owners
SHARE
Scheduled Reports
Used byAnyone reporting upward
KEY DECISIONS
Three calls that shaped the product
Each one had an obvious answer that would have been easier to ship. Full decision boards for every module sit beside this case study.
TEAM PRODUCTIVITY
Kept the legacy Output-Effort Matrix
The obvious move
Replace it with all-new charts.
What we did, and why
Rebuilt it with clear performance zones and kept a Classic UI switch. Managers already trusted that chart, and removing it mid-adoption would have cost us that trust.
TIME PROFILE
Grouped people into 20-60-20 buckets
The obvious move
Rank every user by hours worked.
What we did, and why
Segments gave managers a strategy per group and avoided turning the tool into a surveillance leaderboard.
VENDOR MANAGEMENT
Led with leakage, not every KPI
The obvious move
One dense table of every vendor KPI.
What we did, and why
Leakage was the costliest blind spot, so it comes first. KPIs by vendor follow on drill-down.
LEADING THROUGH DISAGREEMENT
Where I had to bring people with me
Most of the hard work was not in Figma. Each of these started as a reasonable request that would have made the product worse.
TEAM PRODUCTIVITY
They wanted
Every legacy control on the new screen.
I showed
A quick prototype: managers needed three answers first, not twenty filters.
We agreed
Summary first, advanced controls in one Actions panel, Classic UI kept.
SCHEDULED REPORTS
They wanted
A straight like-for-like migration.
I showed
Alignment call with Support: failed deliveries were invisible to the people who depended on them.
We agreed
Same functions, new approach, with a failure insight up front.
VENDOR MANAGEMENT
They wanted
Standard Power BI visuals only.
I showed
A quick prototype: the key story, billed vs leakage per hour, works with standard charts.
We agreed
Standard visuals designed for clarity, with labels that survive screenshots.
THE MODULES
Six modules, one system
Each module solved a specific problem, and each one applied the same principles.

Integration
Problem
Effort and status meant different things in every team’s Jira.
What changed
One-time setup with Test Connection, field mapping and a scheduler.
Signal
Validated with internal users; one-time setup improved satisfaction.

Team Productivity
Problem
No benchmarks and limited drill-down.
What changed
Team vs peer average and previous range, drill-down to any node, Journey Path.
Signal
Higher visibility and positive usability feedback.

Scheduled Reports
Problem
Hard to find reports, no search, invisible failures.
What changed
Two usage-based categories, search, favourites and a failure insight.
Signal
Positive feedback from internal stakeholders.

Vendor Management
Problem
No visibility into leakage; manual reconciliation.
What changed
Leakage meter and trend, top KPIs by vendor, Power BI drill-downs.
Signal
Validated with vertical heads and vendor managers.

Mentoring
Problem
Managers inferred team health manually across features.
What changed
One overview with hybrid work breakup and an AI assistant.
Signal
Tested with 10 users: better clarity and task completion.

Time Profile
Problem
No view of how time was actually spent.
What changed
20-60-20 buckets, core vs non-core split, ideal-hours benchmark.
Signal
Positive feedback from internal stakeholders with improved adoption rate.
OUTCOMES
What changed
40%
faster decision turnaround for managers
10
users in Mentoring prototype tests, with better clarity and task completion
6
modules moved to the new UI, with legacy views kept during the transition
BEYOND THE PRODUCT
How I raised the bar for the team
Senior work outlasts the project. These are the things the team kept using.
REFLECTION
What I’d do differently
Set baselines before launch
Time key tasks on the legacy UI first, so every module can show a before and after in numbers.
Design for the person being measured
Time and productivity tracking can feel like surveillance. I’d give every individual their own view first.
Accessible by default
Some charts relied on red and green alone. I’d add labels or patterns so every manager can read them.
CARRYING FORWARD
If I can’t measure the before, I can’t claim the after.